Floor leveling
Create a smooth, stable base for new floors with expert leveling and subfloor preparation.

Drag the handle to compare before and after.
Level assessment
Flatness checks
Measure peaks, dips, and slopes to plan the right solution.
Subfloor review
Inspect existing boards or slabs to identify movement or weak spots.
Moisture testing
Verify suitable conditions before leveling compounds are applied.
Leveling solutions
Latex smoothing
Self-leveling compounds for a smooth, even base.
Board adjustments
Targeted corrections to remove high spots and dips.
Ready for installation
A stable, flat platform for timber, laminate, or LVT.
Floor leveling process
- Step 1
Survey and tolerance checks.
- Step 2
Subfloor preparation and priming.
- Step 3
Leveling application and curing.
- Step 4
Final checks and installation readiness.
Frequently asked questions
How do you level uneven floors?
We use self-levelling compounds or plywood systems based on the subfloor type.
How long does the levelling compound take to cure?
Drying times vary, but most compounds are ready within 24 hours.
Can you level over existing floors?
Sometimes. We inspect the surface to decide if over-boarding is suitable.