Hardwood Floor Fitting
Install solid hardwood with meticulous layout planning, secure fixing, and a refined finish built to last.


Drag the handle to compare before and after.
Preparation & planning
On-site survey
Detailed measurements and layout planning ensure every board lands exactly where it should.
Finalise plans with customer
We confirm layout, board direction, and key decisions with you before installation starts.
Subfloor readiness
Levelling, damp-proofing, and acoustic underlays matched to your floor specification.
Installation detail
Method matched to your floor
Decide whether to glue down or use the appropriate underlay for your floor and subfloor conditions.
Precision finishing
Door casings undercut, trims hand-scribed, and thresholds aligned for a seamless finish.
Client handover
Protective coverings, cleaning guidance, and aftercare plans delivered before we leave site.
Hardwood Floor Fitting process
- Step 1
Initial consultation, design guidance, and quotation.
- Step 2
Finalise plans with customer, prepare the subfloor and area for installation.
- Step 3
Precise installation with continuous quality checks.
- Step 4
Finishing touches, clean-down, and personalised care advice.
Frequently asked questions
How do you prepare a room before hardwood installation?
We finalise layout plans with you, prepare the subfloor and surrounding area, and confirm installation details before work starts.
Can you supply hardwood flooring materials and finishes?
Yes. We can supply hardwood boards and deliver lacquer, oil, or stain finishes using low-VOC products to suit the look you want.
Which fixing method do you use for solid hardwood?
We recommend glue-down using elastic hardwood adhesive, depending on the subfloor, board profile, and room conditions.
When can we walk on the new floor?
Depending on room size, you can walk lightly on the floor after 12 hours, but we advise waiting at least 24-48 hours for full cure.